# LONGHORN EXCAVATORS, INC. - TEMPORARY CONSTRUCTION SITE
> **Administrative - Formal** · FY2002 · — · Final Order With Penalty
## Case
- **Activity ID:** `42149`
- **Case Number:** 06-2002-4341
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $750
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- LONGHORN EXCAVATORS, INC. (complaint) (settlement)
## Summary

1. SECTION 311(B)(?)(B)(I) OF THE CLEAN WATER ACT ( CWA ),      33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL    POLLUTION ACT OF 1990.                                    2. LONGHORN EXCAVATORS, INC. - TEMPORARY CONSTRUCTION SITE      NEAR THE INTERSECTION OF FM 518 AND WINDAMERE                GALVESTON, GALVESTON COUNTY, TEXAS 77551                  3. RESPONDENT WAS IN VIOLATION OF SECTION 311(J) OF THE CWA     BY: 1) PLAN NOT MAINTAINED ON SITE; 2) RECORDS OF IN-        SPECTIONS OF ABOVEGROUND TANKS ARE NOT MAINTAINED; 3)        VISIBLE OIL LEAKS RESULTING IN ACCUMULATIONS OF OIL IN       DIKED AREAS ARE NOT PROMPTLY CORRECTED; 4) ABOVEGROUND       VALVES AND PIPELINES ARE NOT INSPECTED REGULARLY; AND 5)     FACILITY NOT FULLY FENCED AND ENTRANCE GATES ARE NOT         LOCKED AND/OR GUARDED WHEN PLANT IS UNATTENDED OR NOT IN     PRODUCTION.                                               4. RELIEF SOUGHT PURSUANT TO SECTION 311(B)(6)(B)(I) OF THE     CWA, EPA ASSESSED THE RESPONDENT A CIVIL PENALTY OF $750     FOR THE VIOLATIONS CITED.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*