# GATES ENERGY PRODUCTS, INC.
> **Judicial** · FY1991 · — · Final Order With Penalty
## Case
- **Activity ID:** `44160`
- **Case Number:** 07-1991-0285
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $200K
- **Cost recovery:** $0
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- GATES ENERGY PRODUCTS, INC. (complaint) (settlement)
## Summary

CASE INVOLVES VIOLATION OF NSPS FOR LEAD-ACID BATTERY        MANUFACTURING PLANTS.  40 CFR PART 60, SUBPART KK AT         DEFENDANT'S PLANT IN WARRENSBURG, MO.  BASED ON DEFENDANT'S  RESPONSE TO SECTION 114 ORDER ISSUED BY THE REGION, THERE    ARE 17 AFFECTED FACILITIES AT THE WARRENSBURG PLANT WHICH    ARE SUBJECT TO NSPS SUBPART KK.  OF THOSE 17 FACILITIES,     DEFANDANT HAS FAILED TO CONDUCT INITIAL PERFORMANCE TESTING  ON 5 OF THE FACILITIES AS REQUIRED BY THE REGS, TO           DEMONSTRATE COMPLIANCE WITH THE LEAD EMISSION STANDARDS.     COMPLIANCE TESTING ON SEVEN OF THE OTHER 12 AFFECTED         FACILITIES WAS CONDUCTED WELL BEYOND THE TIME REQUIRED BY    THE REGS. THIS CASE IS PART OF THE NATIONAL MULTI-MEDIA LEAD INTIATIVE.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*