← EPA enforcement cases

FIBERDYNE, NEW HARTFORD, IA

Administrative - Formal · FY1996 · — · Final Order No Penalty · 45538

Penalty
Cost recovery
Compliance action

Case

Case Number
07-1996-0249
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order No Penalty
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

EPA HAS RECEIVED INFORMATION FROM CONFIDENTIAL SOURCES THAT THE FACILITY ROUTINELY TREATS SPENT ACETONE AND OTHER SOLVENTS THROUGH EVAPORATION ON SITE. THE FACILITY ALSO REPORTEDLY HAS BEEN STORING WASTE ON-SITE IN DRUMS FOR SEVERAL YEARS, AND IS ILLEGALLY OPERATING A LANDFILL ON-SITE. THE FACILITY DOES NOT HAVE A PERMIT TO TREAT, STORE, AND DISPOSE OF HAZARDOUS WASTE. THESE ALLEGATIONS WILL BE INVESTIGATED AT THE TIME OF THE RCRA COMPLIANCE INSPECTION AT EACH OF THE TWO FACILITIES. THE EPA RCRA PROGRAM HAS HIRED CONTRACTORS TO CONDUCT EXCAVATION OF THE BURIED DRUMS, AS WELL AS SAMPLING OF THE BURIED AND ABOVE-GROUND WASTE. SAMPLING IS ALSO EXPECTED TO INCLUDE WASTE STREAMS GENERATED IN THE FIBERGLASS MANUFACTURING PROCESS. THE INSPECTION MAY TAKE ONE WEEK OR LONGER TO COMPLETE. ANALYTICAL RESULTS AND INSPECTION REPORTS WILL NOT BE AVAILABLE FOR SEVERAL MONTHS.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown