# AGWAY ET. AL.
> **Judicial** · FY1993 · — · Final Order With Specified Cost Recovery
## Case
- **Activity ID:** `4817`
- **Case Number:** 02-1993-0188
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Specified Cost Recovery
- **Penalty assessed:** —
- **Cost recovery:** $1.42M
- **Compliance action $:** $5.00M
- **Multimedia (multi-env):** N
## Defendants
- AGWAY INC (complaint) (settlement)
- AGWAY PETROLEUM CORPORATION (complaint) (settlement)
- ALLIED SIGNAL INC (complaint) (settlement)
- AMERICAN CAN COMPANY (complaint) (settlement)
- AMERICAN STANDARD INC (complaint) (settlement)
- AMF INC (complaint) (settlement)
- AMOCO OIL (complaint) (settlement)
- ASHLAND CHEMICAL (complaint) (settlement)
- ATLANTIC RICHFIELD (complaint) (settlement)
- AZON CORPORATION (complaint) (settlement)
- BAYER CORPORATION (complaint) (settlement)
- BCE HOLDINGS INC (complaint) (settlement)
- BOISE CASCADE CORPORATION (complaint) (settlement)
- BRENEMEN COMPANY (complaint) (settlement)
- BRISTOL-MYERS SQUIBB COMPANY (complaint) (settlement)
- CAMDEN WIRE (complaint) (settlement)
- CARRIER CORPORATION (complaint) (settlement)
- CECOS INTERNATIONAL INC (complaint) (settlement)
- CHAMPION INTERNATIONAL CORP (complaint) (settlement)
- CHEMCOAT INC (complaint) (settlement)
- CHEVRON USA INC (complaint) (settlement)
- CITIES SERVICE (OXY USA INC) (complaint) (settlement)
- COOPER INDUSTRIES INC (complaint) (settlement)
- CORNELL UNIVERSITY (complaint) (settlement)
- CRUCIBLE MATERIALS CORPORATION (complaint) (settlement)
- DECISION ONE CORPORATION (complaint) (settlement)
- DEL-MET CORPORATION (complaint) (settlement)
- DOW CHEMICAL COMPANY (complaint) (settlement)
- DUPONT COMPANY (complaint) (settlement)
- DUSO CHEMICAL COMPANY INC (complaint) (settlement)
- EICHLEAY CORPORATION (complaint) (settlement)
- ELF ATOCHEM NORTH AMERICA (complaint) (settlement)
- EP SUB INC (complaint) (settlement)
- EPEC OIL COMPANY (complaint) (settlement)
- FARREL COMPANY (complaint) (settlement)
- FLOQUIL POLLY S COLOR CORP INC (complaint) (settlement)
- GAF CORPORATION (complaint) (settlement)
- GENERAL ELECTRIC COMPANY (complaint) (settlement)
- GENERAL MOTORS CORPORATION (complaint) (settlement)
- GETTY OIL COMPANY (complaint) (settlement)
- HASBRO INC (complaint) (settlement)
- INGERSOLL-RAND COMPANY (complaint) (settlement)
- JONES CHEMICALS INC (complaint) (settlement)
- LABELON CORP (complaint) (settlement)
- LINDBERG HEAT TREATING CO (complaint) (settlement)
- M WILE & CO (complaint) (settlement)
- MASONITE CORPORATION (complaint) (settlement)
- MATLOCK INC (complaint) (settlement)
- MINNESOTA MINING AND MANUFACTURING CO (complaint) (settlement)
- MOBIL OIL CORPORATION (complaint) (settlement)
## Summary

FACILITY:  POLLUTION ABATEMENT SERVICES, OSWEGO, NY          POLLUTION ABATEMENT SERVICES FACILITY OPERATED A HIGH        TEMPERTURE LIQUID CHEMICAL WASTE INCINERATOR FROM 1970 TO    1977.  DURING THIS PERIOD, NUMEROUS DRUMS CONTAINING A       VARIETY OF CHEMICAL WASTE FROM NUMEROUS GENERATORS, WHICH    INCLUDED  HAZARDOUS SUBSTANCES  WITHIN THE MEANING OF SECT.  101(14) OF CERCLA, 42 WASTES CONTAINING HAZARDOUS SUBSTANCES WERE ALSO STORED IN LAGOONS OR TANKS AT THE SITE.            146 (PROPOSED DEFENDANTS)                                    09/30/92 - PRE-REFERRAL LITIGATION REPORT SENT.              *                                                            09/29/97 - REFERRED CD TO DOJ FOR SIGNATURE; LODGING & ENTRY 01/22/98 - COMPLAINT FILED AND CD LODGED                     ? -DATE  - AMENDED COMPLAINT FILED                           08/10/98 - CD ENTERED BY THE COURT.                          09/28/99 - TELEPHONIC REFERRAL TO DOJ (AMENDMENT ENTERED)    01/21/00 - COMPLAINT FILED & CD LODGED (CORNELL UNIVERSITY). 04/17/00 - CD ENTERED CTNO DIFFERENT 00-CV-0121.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*