# GATTIS CONSTRUCTION COMPANY
> **Administrative - Formal** · FY1992 · — · Withdrawn by Region/State
## Case
- **Activity ID:** `49088`
- **Case Number:** 08-1992-0100
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Withdrawn by Region/State
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- GATTIS CONSTRUCTION COMPANY (complaint)
- GATTIS, ARLEN (complaint)
## Summary

04/22/92:  RESPONDENT ARLEN GATTIS IS PRESIDENT OF GATTIS  CONSTRUCTION COMPANY.  DURING 1990 THE GATTIS CONSTRUCTION   WAS CONTRACTED TO BUILD TWIN HOME RESIDENCES IN THE WALDEN   POND PHASE B DEVELOPMENT.  FOLLOWING INSPECTIONS OF THE SITE ON OCTOBER 29, 1990 AND NOVEMBER 19, 1990 THE U.S. ARMY      CORPS OF ENGINEERS AND THE EPA DETERMINED THAT THE SITE      CONTAINS APPROXIMATELY 4.0 TO 4.5 ACRES OF WETLANDS.         BETWEEN APPROXIMATELY JULY AND NOVEMBER 1990, THE GATTIS     CONSTRUCTION COMPANY AND OTHER CONTRACTORS AND               SUBCONTRACTORS PERFORMED GRADING AND ROAD CONSTRUCTION,      INSTALLATION OF WATER AND SEWER LINES AND OTHER UTILITIES,   AND CONSTRUCTION OF SIX TWIN HOME DWELLING UNITS IN THE      WALDEN POND PHASE B DEVELOPMENT.  IN THE COURSE OF THE       CONSTRUCTION, AT LEAST 3,500 CUBIC YARDS OF DREDGED OR       IMPORTED FILL MATERIAL WERE DISCHARGED IN AT LEAST 1.8 ACRES OF THE WETLANDS USING A BACKHOE, A BULLDOZER, AND DUMP       TRUCKS.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*