GRACE, W.R. & COMPANY

Judicial · FY1992 · — · Final Order With Penalty · 49440

$510K
Penalty
Cost recovery
Compliance action

Case

Case Number
08-1992-0537
Type
Judicial
Lead
EPA
Outcome
Final Order With Penalty
DOJ Docket
90-5-2-1-1834
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

W.R. GRACE & COMPANY-CONN., INC., OWNS A DEFUNCT TREMOLITE MINE AND ASSOCIATED PROPERTY IN LIBBY, MONTANA, THE EXTREME NORTHWESTERN CORNER OF THAT STATE. OVER THE COURSE OF THE LAST TWO YEARS, GRACE BEGAN DEMOLISHING BUILDINGS AT THE MINE SITE AS AN INITIAL STEP TOWARD RESTORING THE PROPERTY TO ITS SOMEWHAT NATURAL STATE. IN PARTICULAR, IN SEPTEMBER OF 1990, GRACE CLOSED ITS MILL BUILDING WHERE IT MILLED VERMICULITE ORE, AND IT BEGAN SELLING OFF ITS MILLING EQUIPMENT IN PREPARATION FOR DEMOLITION OF THE MILL BUILDING. IN NOVEMBER OR DECEMBER OF 1991, GRACE DEMOLISHED ITS MILL BUILDING. THEY PERFORMED THIS DEMOLITION BY FIRST HAVING AN ENGINEER ASSESS THE BUILDING AND DESIGNATE AREAS TO BE WEAKENED BY BLOW TORCH. AFTER WEAKENING THE KEY AREAS, GRACE EMPLOYEES TIED HEAVY CABLES TO THE BUILDING, CONNECTED THE CABLES TO TWO BULL- DOZERS, AND PUSHED AND PULLED WITH THE BULLDOZERS UNTIL THE BUILDING COLLAPSED. A CALL FROM A LIBBY AREA CITIZEN TO BRENDA SOUTH, NESHAP ASBESTOES COORDINATOR, TIPPED EPA TO THE FACT THAT 10 TO 20 WORKERS WERE PERFORMING A DEMOLITION WITHOUT BENEFIT OF PROTECTIVE CLOTHING. INSPECTIONS REVEALED LEVELS OF ASBESTOS. THIS ACTION IS BASED ON THE FAILURE OF GRACE TO HAVE NOTIFIED THE STATE, AND EPA NESHAPS OF THE DEMOLITION, FAILURE TO HAVE A REPRESENTATIVE AT THE SITE, AND RELATED NESHAP VIOLATIONS.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown