# NAYLOR, WENTWORTH ARCHITECTS, P.C.
> **Administrative - Formal** · FY1993 · — · Withdrawn By EPA HQ
## Case
- **Activity ID:** `49716`
- **Case Number:** 08-1993-0282
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Withdrawn By EPA HQ
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- NAYLOR, WENTWORTH ARCHITECTS (complaint)
## Summary

IN 1988 RESPONDENT PREPARED A MANAGEMENT PLAN FOR THE LEA.   ON OR ABOUT 10/07/91 EPA CONDUCTED AN INSPECTION AT THE      BEAVER COUNTY SCHOOL DISTRICT TO DETERMINE IF COMPLIANCE     HAD BEEN IMPLEMENTED FOR 40 C.F.R. PART 763 SUBPART E.       IT WAS OBSERVED THAT THE RESPONDENT FAILED TO PROPERLY       IDENTIFY ONE OF THE 4 TPES OF 12 X 12 INCH GLUED             CEILING TILE LOCATED IN THE BELKNAP ELEMENTARY SCHOOL        DISTRICT.  REPONSDENTS FAILURE TO PROPERLY COMPLETE THE      REQUIRED MANAGEMENT PLAN CONSTITUTES A VIOLATION OF SECTION  15 OF TSCA                                                   TOTAL PROPOSED PENALTY IS $60,000                            ADJUSTED FINAL PENALTY IS $25,000.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*