# NORTH DAKOTA STATE COLLEGE OF SCIENCE
> **Administrative - Formal** · FY1993 · — · —
## Case
- **Activity ID:** `49719`
- **Case Number:** 08-1993-0285
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** $2K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- NORTH DAKOTA STATE COLLEGE OF SCIENCE (complaint) (settlement)
## Summary

ON OR ABOUT 3/23/93 AN AUTHORIZED EPA INSPECTOR CONDUCTED    AN INSPECTION AT THE FACILITY TO DETERMINE COMPLIANCE WITH   TSCA AND EPA REGULATIONS RELATING TO PCBS.  THIS TESTING     REVEALED THAT 2 MINERAL OIL TRANSFORMERS CONTAINED A PCB     CONCENTRATION GREATER THAN 500PPM.  RESPONDENT FAILED        TO REGISTER THE TRANSFORMERS WITH THE FIRE RESPONSE WITHIN   3O DAYS OF DISCOVERY. THIS INACTION VIOLATES 40 C.F.R. 761.3 761.30(A))1)(XV)(D).                                         RESPONDENT FAILED TO KEEP INSPECTION AND MAINTENANCE RECORDS DURING THE YEARS 1987 & 1988. THIS VIOLATES 40 C.F.R 761.30  (A)(1)(XII).                                                 RESPONDENT FAILED TO DEVELOP AN ANNUAL DOCUMENT LOG OF THE   DISPOSITION OF PCBS AND PCB ITEMS IN 1987 & 1988.  THIS      VIOLATES 40 C.F.R. 761.180(A)(1).                            RESPONDENT FAILED TO MARK THE STRUCTURE HOUSING THE PCB      LARGE HIGH VOLTAGE CAPACITORS WITH MARK  WL .  THIS          VIOLATES 40 C.F.R.(C)(2)(II).                                PENALTY PROPOSED AT $10,000.                                 RESPONDENT HAS 20 DAYS AFTER RECEIPTS OF THIS COMPLAINT      TO FILE A WRITTEN ANSWER TO CONTEST THESE ALLEGATIONS.       IF WRITTEN ANSWER IS NOT RECEIVED WITHIN 30 DAYS, THE        TOTAL PENALTY PROPOSED ID DUE.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*