# BISON ENGINEERING, INC.
> **Administrative - Formal** · FY1993 · — · Withdrawn by Region/State
## Case
- **Activity ID:** `49734`
- **Case Number:** 08-1993-0300
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Withdrawn by Region/State
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- BISON ENGINEERING, INC (complaint)
## Summary

ON OR ABOUT 9/21/92, AN AUTHORIZED EPA INSPECTOR CONDUCTED   AN INSPECTION TO DETERMINE COMPLIANCE WITH AHERA AND ITS     IMPLEMENTING REGULATIONS.                                    INSPECTOR OBSERVED THAT RESPONDENT FAILED TO PROPERLY        INSPECT EACH SCHOOL BUILDING WHICH LEA OWNS.RESPONDENT       WAS INDICTED ON 6 COUNTS                                     COUNTS 1 & 2                                                 RESPONDENT FAILED TO PROPERLY IDENTIFY AND INSPECT THE       FOLLOWING HOMOGENOUS AREAS: HIGH SCHOOL & ELEMENTARY SCHOOL  BUILDINGS.                                                   COUNTS 3 & 4                                                 RESPONDENT FAILED TO COLLECT AND SUBMIT FOR ANALYSIS,        BULK SAMPLESOF MATERIAL.                                     COUNTS 5 & 6                                                 RESPONDENT FAILED TO PROPERLY DEVELOP, ESTABLISH, INCLUDE    AND MAINTAIN ALL REQUIRED INFORMATION IN THE 2 MANAGEMENT    PLANS.                                                       UNADJUSTED TOTAL PROPOSED PENALTY  $78,000.                  ADJUSTED TOTAL PROPOSED PENALTY $50,000.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*