# URBAN DRAINAGE & FLOOD CONTROL DISTRICT/HEMP & HOFFMAN, INC.
> **Administrative - Formal** · FY1994 · — · —
## Case
- **Activity ID:** `49815`
- **Case Number:** 08-1994-0050
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** $125K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- CITY OF LAFAYETTE ADMINISTRATOR (complaint)
- HEMP & HOFFMAN, INC. (complaint)
- URBAN DRAINAGE & FLOOD CONTROL DISTRICT (complaint) (settlement)
## Summary

URBAN DRAINAGE AND FLOOD CONTROL DISTRICT AND KEMP &         HOFFMAN RELOCATED THE CHANNEL OF COAL CREEK BEHIND THE CITY  OF LAFAYETTE MUNICIPAL SHOPS IN LAFAYETTE, CO BETWEEN        APPROXIMATELY 3/15/93 AND 4/8/93.  IN ADDITION, KEMP AND     HOFFMAN, ACTING PURSUANT TO ITS CONTRACTURAL OBLIGATIONS     WITH THE DISTRICT, DISCHARGED DREDGE AND FILL MATERIAL       INTO COAL CREEK TO CONSTRUCT A 210 LINEAR FOOT LOW FLOW      CHANNEL, TWO DROP STRUCTURES AND AN EARTHEN BERM, TO BLOCK   THE MAIN CHANNEL OF COAL CREEK AND TO REDIRECT THE FLOW OF   THE CREEK INTO THE NEW CHANNEL.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*