AN INSPECTION CONDUCTED ON 6/6/95 REVEALED THAT THE RES- PONDENT FAILED TO PROVIDE A RELEASE DETECTION METHOD FOR 3 USTS, FAILED TO REPORT A RELEASE WITHIN 24 HRS AND FAILED TO INVESTIGATE THE FAILED TANK TIGHTNESS TEST. A FEDERAL PEN- ALTY OF $17,380 WAS PROPOSED.