# INLAND PRODUCTION CO.
> **Administrative - Formal** · FY2000 · — · Final Order With Penalty
## Case
- **Activity ID:** `51449`
- **Case Number:** 08-2000-0049
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $9K
- **Cost recovery:** —
- **Compliance action $:** $0
- **Multimedia (multi-env):** N
## Defendants
- INLAND PRODUCTION COMPANY (complaint) (settlement)
## Summary

THIS ADMINISTRATIVE PENALTY ORDER IS ISSUED TO INLAND        PRODUCTION CO. FOR FAILURE TO PREPARE AND IMPLEMENT AN       SPCC PLAN.  ALSO DURING AN INSPECTION ON OR ABOUT 9/16/99,   THE FOLLOWING VIOLATIONS WERE IDENTIFIED:  1) NO SECONDARY   CONTAINMENT FOR THE HEATER TREATER AND SEPARATOR AND 2)      INADEQUATE SECONDARY CONTAINMENT FOR TWO 400 BARREL OIL      STORAGE TANKS.  THIS ORDER IS SUBJECT TO THE  22 RULE        WHICH IS ENTERED INTO BY THE PARTIES FOR THE PURPOSE OF      SIMULTANEOUSLY COMMENCING AND CONCLUDING THIS MATTER.  THE   PENALTY ASSESSED FOR THESE VIOLATIONS IS $8,500.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*