- **Activity ID:** `51865`
- **Case Number:** 08-2001-0155
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** $1K
- **Cost recovery:** —
- **Compliance action $:** $0
- **Multimedia (multi-env):** N
## Defendants
- RIM OPERATING, INC. (complaint) (settlement)
## Summary

THIS ADMINISTRATIVE PENALTY ORDER IS ISSUED TO RIM OPERATING FOR FAILURE TO PREPARE AND IMPLEMENT A FACILITY SPCC PLAN;   FOR NOT HAVING A PE CERTIFICATION AS REQUIRED; FOR FAILURE   TO ADDRESS IS THE SPCC PLAN IS REVIEWED EVERY THREE YEARS;   FOR HAVING INADEQUATE SECONDARY CONTAINMENT FOR STORAGE      TANKS AND NO SECONDARY CONTAINMENT FOR HEATER/TREATERS AND   SEPARATORS; FOR INADQUATELY ADDRESSING SPILL PREVENTION AND  CONTROL MEASURES FOR DRILLING AND WORKOVER OPERATIONS;       FAILURE TO INDICATE THAT INSPECTION PROCEDURES AND RECORDS   WILL BE KEPT FOR A MINIMUM OF THREE YEARS AND FOR NOT HAVING A DESIGNATED PERSON RESPONSIBLE FOR SPILL PREVENTION.  THIS  ORDER IS SUBJECT TO THE  22 RULE  WHICH IS ENTERED INTO BY   THE PARTIES FOR THE PURPOSE OF SIMULTANEOUSLY COMMENCING AND CONCLUDING THIS MATTER.  THE PENALTY ASSESSED IS $1300.      THIS ORDER PERTAINS TO AN OIL PRODUCTION FACILITY, CHU #2-1, LOCATED AT HILIGHT FIELD, CAMPBELL COUNTY, WYOMING.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*