THIS CASE INVOLVES THE DEMOLITION OF TWO BUILDINGS AT THE CALIFORNIA STATE UNIVERSITY, SACRAMENTO CAMPUS ( CSUS ). EACH BUILDING HAD AN ESTIMATED FLOOR AREA OF ABOUT 9000 SQUARE FEET, WAS TWO STORIES HIGH, AND HAS SERVED AS THE ANTHROPOLOGY I AND II CLASSROOM BUILDINGS. CSUS OWNED THE BUILDINGS, WHICH WERE DEMOLISHED BY ALLEN L. BENDER, INC. BENDER SUBCONTRACTED THE ASBESTOS REMOVAL PROJECT OUT TO ASBESTOS CONTROL GROUP, INC. DEFENDANTS REMOVED APPROX. 11,000 SQUARE FEET OF ASBESTOS-CONTAINING ROOFING MATERIAL AND 4,000 LINEAR FEET OF ASBESTOS-CONTAINING PIPE INSULATION. IN REMOVING ASBESTOS-CONTAINING MATERIAL FROM ANTHROPOLOGY I AND II, THE DEFENDANTS FAILED TO COMPLY WITH FEDERAL REGULATIONS COVERING ASBESTOS REMOVAL AND DISPOSAL. THESE REGULATIONS, SET FORTH AT 40 C.F.R. PART 61, SUBPART M,ARE KNOWN AS THE NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS (NESHAPS) FOR ASBESTOS. DEFENDANTS DISMANTLED PIPES WRAPPING IN ASBESTOS MATERIAL WITHOUT KEEPING THE MATERIAL ADEQUATELY WET IN VIOLATION OF 40 C.F.R. DEFENDANTS FAILED TO ADEQUATELY WET ASBESTOS- CONTAINING ROOFING MATERIAL DURING STRIPPING, AND FAILED TO CAREFULLY LOWER THE MATERIALS, NOT DROPPING OR THROWING THEM, IN VIOLATION OF 40 C.F.R., RESPECTIVELY. DEFENDANTS ALSO DID NOT ENSURE THAT THE ASBESTOS MATERIAL REMOVED WITH THE PIPES REMAINED WET UNTIL COLLECTED