# FOSTER J. EXPRESS
> **Administrative - Formal** · FY2001 · — · Final Order With Penalty
## Case
- **Activity ID:** `53761`
- **Case Number:** 09-2001-0054
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $250
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- JOHN R. FOSTER D/B/A FOSTER J. EXPRESS (complaint) (settlement)
## Summary

THIS IS AN UST COMPLAINT CONSENT AGREEMENT/FINAL ORDER (CA/F O).  A CA/FO WAS ISSUED FOR THE FOLLOWING VIOLATIONS: FAILUR E TO PROVIDE ANY CORROSION PROTECTION FOR METAL PIPING; FAIL URE TO HAVE AN OVERFILL PREVENTION SYSTEM ON A NEW TANK; FAI LURE TO HAVE SPILL PREVENTION AND OVERFILL PREVENTION SYSTEM  ON AN EXISTING TANK; FAILURE TO PROVIDE ADEQUATE RELEASE DE TECTION METHOD FOR PETROLEUM TANKS; FAILURE TO CONDUCT LINE  TIGHTNESS TEST OR USE MONTHLY MONITORING ON SUCTION PIPING;  FAILURE TO COMPLY WITH FINANCIAL RESPONSIBILITY REQUIREMENTS

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*