# NU'UULI SERVICE STATION
> **Administrative - Formal** · FY2001 · — · Final Order With Penalty
## Case
- **Activity ID:** `53766`
- **Case Number:** 09-2001-0059
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $250
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- PAULA STEPHENSON D/B/A NU'UULI SVS STA (settlement)
## Summary

THIS IS A AN UST COMPLAINT CONSENT AGREEMENT/FINAL ORDER (CA /FO).  A CA/FO WAS ISSUED FOR THE FOLLOWING VIOLATIONS:FAILU RE TO PROVIDE ANY CORROSION PROTECTION FOR METAL PIPING; FAI LURE TO USE AN OVERFILL PREVENTION SYSTEM; FAILURE TO PROVID E ADEQUATE RELEASE DETECTION METHOD FOR PETROLEUM TANKS; FAI LURE TO PROVIDE ANY RELEASE DETECTION FOR UNDERGROUND PIPING ; FAILURE TO PERMANENTLY CLOSE OR UPGRADE A TEMPORARILY CLOS ED UST SYSTEM AFTER 12 MONTHS; AND FAILURE TO COMPLY WITH FI NANCIAL RESPONSIBILITY REQUIREMENTS

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*