THIS IS AN UST COMPLAINT CONSENT AGREEMENT/FINAL ORDER (CA/F O). A CA/FO WAS ISSUED FOR THE FOLLOWING VIOLATIONS: FAILUR E TO PERFORM REPLACEMENT, UPGRADE OR CLOSURE FOR EXISTING SU BSTANDARD TANK SYSTEM; FAILURE TO PROVIDE ADEQUATE RELEASE D ETECTION METHOD FOR PETROLEUM TANKS; FAILURE TO CONDUCT LINE TIGHTNESS TEST OR USE MONTHLY MONITORING ON SUCTION PIPING; FAILURE TO PERMANENTLY CLOSE OR UPGRADE A TEMPORARILY CLOSE D UST SYSTEM AFTER 12 MONTHS; AND FAILURE TO COMPLY WITH FIN ANCIAL RESPONSIBILITY REQUIREMENTS.