THIS REFERRAL INVOLVES THE FILING OF A CIVIL ACTION TO SEEK PENALTIES AND INJUNCTIVE RELIEF FOR VIOLATION OF THE NOTIFICATION AND WORK PRACTICE STANDARDS' REQUIREMENTS SET FORTH IN THE NATIONAL EMISSIONS STANDARD FOR ASBESTOS. AFTER SEVERAL CONTACTS WITH EMPLOYEES OF THE UNIVERSITY OF WASHINGTON IN 7/86, REGARDING NON-NOTIFICATION AND SUBSTAN- TIVE ASBESTOS NESHAPS VIOLATIONS AT SEVERAL BUILDINGS ON CAMPUS, AN INSPECTOR FOR PSAPCA INSPECTED HUSKY STADIUM WHERE SANDBLASTING ACTIVITY WAS BEING DONE TO PREPARE STRUCTURAL MEMBERS IN THE SOUTH STANDS FOR PAINTING. THE OWNER UNIVERSITY HAD CONTRACTED THE WORK TO CLARK CONSTRUC- TION, WHICH IN TURN SUBCONTRACTED TO MONARCH PAINTING. ONE OF THE WORKERS TOLD THE INSPECTOR THERE WAS ASBESTOS ALL OVER THE STANDS AND POINTED TO A BROWN CELLULOSE MATERIAL WHICH WAS MIXED WITH THE BLACK BLASTING GRIT COVERING NUMEROUS ROWS AND EXTENDING THROUGH SEVERAL SECTIONS OF THE STADUIM. SEVERAL SAMPLES TAKEN AT THIS TIME WERE POSITIVE FOR ASBESTOS. THE BLASTING RESULTING IN THE ASBESTOS REMOVAL TOOK PLACE 7/23-25/86. CLEANUP OF THE BLASTING GRIT CONTAMINATED BY THE ASBESTOS COMMENCED ON 7/30/86, WHICH THE UNIVERSITY CONSIDERED COMPLETE ON 8/1/86. SUBSEQUENT INSPECTIONS BY PSAPCA INSPECTOR INDICATED THAT ASBESTOS WAS STILL SCATTERED THROUGHOUT THE STADIUM AND FURTHER DISCUSSIONS RESULTED IN THE USE OF HEPA VAC TRUCKS TO CLEANUP