THE FACILITY WAS INSPECTED IN JUNE 1995 AND NOTIFIED IN EARLY 1996 THAT IT WAS REQUIRED TO HAVE AN SPCC PLAN (THE FACILITY HAD NO PLAN AND NO SECONDARY CONTAINMENT, THEREFORE ANY RELEASE OF OIL WOULD MOST LIKELY IMPACT WATERS OF THE U.S.). THE SITE WAS REINSPECTED IN JUNE 1996 AND THE SAME VIOLATIONS NOTED.