# BOOMSNUB
> **Judicial** · FY1996 · — · Final Order With Unspecified Cost Recovery
## Case
- **Activity ID:** `55302`
- **Case Number:** 10-1996-0095
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Unspecified Cost Recovery
- **Penalty assessed:** $0
- **Cost recovery:** $0
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- BOOMSNUB CORPORATION (complaint) (settlement)
- EDWARD TAKITCH (complaint) (settlement)
- JASON NIBLETT (complaint) (settlement)
## Summary

THIS IS A REFERRAL TO RECOVER EPA'S REMOVAL COSTS.  THIS     FACILITY WAS OPERATED BY BOOMSNUB CORPORATION, JASON NIBLETT AND EDWARD TAKITCH AS A CHROME PLATING FACILITY.  IN 1994    EPA DETERMINED THAT THE CONTAINMENT VAULT WAS LEAKING.  A    CRIMINAL ACTION WAS FILED AND A REMOVEL PERFORMED.  ON JUNE  20, 1994 EPA INITIATED A REMOVAL ACTION WHICH INCLUDED       DEMOLITION AND REMOVAL OF THE PLATING SHOP, DISPOSAL OF OVER 300 DRUMS OF WASTE, EXCAVATION OF OVER 6,000  TONS OF        CONTAMINATED SOIL AND CONSTRUCTION OF A GROUNDWATER          TREATMENT SYSTEM.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*