FACILITY PLACED APPROXIMATELY 2,000 CUBIC YARDS OF ROCK RIPRAP ALONG 300-400 LINEAL FEET OF THE WILD AND SCENIC CORRIDOR OF THE SKAGIT RIVER WITHOUT PERMIT AUTHORIZATION FROM THE U.S. ARMY CORPS OF ENGINEERS. THE WORK WAS CONDUCTED AFTER ACKNOWLEDGING IN WRITING TO THE CORPS THAT SCPW UNDERSTOOD THAT AN INDIVIDUAL PERMIT WOULD BE REQUIRED FOR THE WORK.