# MR. GEORGE KEHM, PRESIDENT
> **Administrative - Formal** · FY2006 · — · Final Order With Penalty
## Case
- **Activity ID:** `600002518`
- **Case Number:** 03-2006-0181
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- MR. GEORGE KEHM, PRESIDENT (complaint) (settlement)
## Summary

Facility failed to: (1) condut one cathodic protetion test, (2) perform an annual test of the lines and line leak detectors, and (3) maintain documentation of compliance with release detection requirements on one UST for one month.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*