← EPA enforcement cases

GREAT LAKES ENGINEERING INC (SB)

Administrative - Formal · FY2006 · — · — · 600002943

Penalty
Cost recovery
Compliance action

Case

Case Number
05-2006-9915
Type
Administrative - Formal
Lead
EPA
Outcome
Multimedia
Self-disclosure
N

Defendants (1)

Summary

U.S. EPA & GREAT LAKES ENGINEERING, INC. ENTER INTO A CONSENT AGREEMENT AND FINAL ORDER On September 5, 2006, Region 5 and Great Lakes Engineering, Inc. (Great Lakes), Maple Grove, MN, entered into a Consent Agreement and Final Order (CAFO) in resolution of violations that were detected as a result of a March 22, 2005, Compliance Evaluation Inspection. The Complaint was filed simultaneously with the CAFO. The Combination Complaint and CAFO alleges that GLE failed to obtain a tank system design and installation assessment for a hazardous waste storage tank system; failed to respond to releases or spills of hazardous waste from its production equipment in a timely manner; failed to maintain its facility to minimize the possibility of fire, explosion, or the release of hazardous waste into the environment; failed to store hazardous waste in either tanks or containers; failed to keep a container of hazardous waste closed; and failed to properly label two containers of hazardous waste. In the CAFO, GLE has agreed to pay a civil penalty of $44,764.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown