8/24/06 - ADMINISTRATIVE ORDER ISSUED. THE SYSTEM FAILED TO CERTIFY TO EPA THAT THE SYSTEM HAD COMPLETED A VULNERABILITY ASSESSMENT (VA), AS REQUIRED BY SDWA SECTION 1433(a). ADDITIONALLY, THE SYSTEM FAILED TO CERTIFY TO EPA THAT THE SYSTEM PREPARED OR REVISED, WHERE NECESSARY, AN EMERGENCY RESPONSE PLAN (ERP) THAT INCORPORATES THE RESULTS OF THE COMPLETED VULNERABILITY ASSESSMENT, AS REQURIED BY SDWA SECTION 1433(b). THE VA CERTIFICATION WAS REQUIRED AT THE TIME OF VA SUMITTAL AND THE ERP CERTIFICATION NOT LATER THAN 6 MONTHS AFTER THE VA WAS COMPLETED.