FEDERAL FACILITY AGREEMENT: NEW LONDON SUBMARINE BASE #CTD980906515

FY17:  The ESD modifies the ROD by adding a new dredge area, reducing dredge depth in certain areas and changing certain of the areas requiring land use controls (LUCs), and requiring placement of cap material underneath a quay wall overhang. The ESD also documents increased remedy implementation cost.

ROD REQUIRES INSTITUTIONAL CONTROLS
2008 ROD:  INTSTITUTIONAL CONTROLS - NONE
2012 ROD
8/3/20  ESD

---