# Sieger Engineering
> **Administrative - Formal** · FY2006 · — · Final Order With Penalty
## Case
- **Activity ID:** `600016475`
- **Case Number:** 09-2006-0238
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Sieger Engineering (complaint) (settlement)
## Summary

This is a Administrative Penalty Action pursuant to EPCRA Section 313 resolving a self-disclosed violation by Sieger Engineering. The violation involves failure to file timely Toxic Chemical Inventory Reporting Forms required under EPCRA Section 313 for nickel and chromium in the years 2001-2004. The respondent self-disclosed this omission on 10/31/05. Pursuant to the EPA Audit Policy, Respondent met criteria for 100% mitigation of the penalty (calcualted as $76,736). Accordingly, the Consent Agreement and Final Order establishes a penalty of zero dollars ($0).

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*