MOTIVA HAS FAILED TO COMPLY WITH VARIOUS PROVISIONS OF THE BULK TERMINAL MACT AND BULK TERMINAL NSPS. THESE VIOLATIONS INCLUDE: 1) FAILURE TO USE PRESSURE VACUUM VENTS SET TO OPEN AT OR ABOVE 18 INCHES WATER COLUMN AS REQUIRED BY 40 CFR SECTIONS 60.502(i) AND 63.422(a); 2) FAILUE TO REPAIR LEAK WITHIN 15 DAYS AS REQUIRED BY 40 CFR SECTION 60.502(i) AND 40 CFR 63.424(c); 3) FAILURE TO OPERATE THE FACILITY IN A MANNER CONSISTENT WITH GOOD AIR POLLUTION CONTROL PRACTICES FOR MINIMIZING EMISSIONS AS REQUIRED BY THE NESHAP GENERAL PROVISIONS AT 40 CFR SECTION 63.6(e).