# CITY OF MERIDIAN AND SOMMER CONSTRUCTION INC
> **Administrative - Formal** · FY2007 · — · Final Order With Penalty
## Case
- **Activity ID:** `600030433`
- **Case Number:** 10-2007-0100
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- City of Meridian (complaint) (settlement)
- Sommer Construction Inc (SB) (complaint) (settlement)
## Summary

Respondents failed to comply with conditions and requirements specified in the Storm Water Construction General Permit.  Violations included discharging from excavation pit without adequate pollution controls, inadequate quantity and quality of self-inspections and lack of stabilization, among other things.

---