ON FEBRUARY 5, 2007, REGION 5 FILED AN ADMINISTRATIVE ORDER ON CONSENT (AOC), DOCKET NUMBER V-W-07-C-862, FOR WISCONSIN PUBLIC SERVICE CORPORATION (WPSC) TO DO A REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) FOR THE CAMPMARINA SITE IN SHEBOYGAN, WISCONSIN. THE CAMPMARINA WORK IS BEING DONE UNDER THE SUPERFUND ALTERNATIVE SITE (SAS) PROGRAM AND IS PART OF A PACKAGE OF SITES THAT WPSC IS ADDRESSING WITH THE REGION. THE CAMPMARINA SITE WAS A FORMER MANUFACTURED GAS PLANT (MGP) ALONG THE BANKS OF THE SHEBOYGAN RIVER. WASTES AND BY-PRODUCTS FROM THE MGP REMAIN ON THE FORMER PLANT SITE AND IN THE ADJACENT RIVER. THE CONTAMINANTS OF CONCERN ARE POLYAROMATIC HYDROCARBONS AND OTHER ORGANIC HYDROCARBONS. THE RI/FS WILL DETERMINE THE NATURE AND EXTEND OF THE CONTAMINATION AND PROVIDE A SET OF REMEDIAL ALTERNATIVES FOR THE TWO OPERABLE UNITS.