# MS. ELDA MILLER C/O ROY SOUSLEY
> **Administrative - Formal** · FY2007 · — · —
## Case
- **Activity ID:** `600044803`
- **Case Number:** 03-2007-0202
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- MS. ELDA MILLER c/o ROY SOUSLEY (SB) (settlement)
## Summary

AT THE DIRECTION OF MS. ELDA MILLER(LANDOWNER), mR ROY SOUSLEY (SON) PLACED FILL MATERIAL WITH A CATCH BASIN AND A RISER PIP IN THE STREAM CHANNEL IN AN EFFORT TO DIVERT THE FLOW INTO AN EXISTING SERIES OF UNDERSIZED CULVERS.  THE STRUCTURE IS ACTING AS A DAM AND BACKING UP WATER ONTO THE ADJACENT PROPERTY CAUSING FLOODING.  THE TOTAL IMPACT IS 37 LINEAR FEET OF STREAM.

---