Respondents failed to comply with conditions and requirements specified in the Storm Water Construction General Permit. Note: At the time of the inspection (05/17/2007), both operators were unpermitted. On 05/18/2007, the owner/operator, Crossroads submitted an NOI for coverage under the CGP.