# REYNOLDS OIL COMPANY, INC.
> **Administrative - Formal** · FY2007 · — · Final Order With Penalty
## Case
- **Activity ID:** `600045211`
- **Case Number:** 03-2007-0162
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- REYNOLDS OIL COMPANY, INC. (SB) (complaint) (settlement)
## Summary

RESPONDENT OWNS AND OPERATES THREE FACILITIES WITH UNDERGROUND STORAGE TANKS (USTS) AND UST SYSTEMS.  THE CONSENT AGREEMENT AND FINAL ORDER RESOLVED SIX COUNTS OF VIOLATIONS:  FAILURE TO PROVIDE ANNUAL LINE TIGHTNESS TESTING FOR PRESSURIZED PIPING AT USTS AT THE FUEL-FILL SITE AND THE CARLOCK SITE IN LEWISBURG, WV, FAILURE TO CONDUCT CATHODIC PROTECTION FOR PIPING CONNECTED TO USTS AT THE CARLOCK SITE, FAILURE TO PROVIDE RELEASE DETECTION FOR USTS AT THE RIVERVIEW EXXON SITE IN ALDERSON, WV; FAILURE TO INPECT THE IMPRESSED CURRENT CATHODIC PROTECTION SYTEM AT THE RIVERVIEW EXXON SITE AND FAILURE TO MAINTAIN THE RESULTS OF TESTING THE IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM AT THE RIVERVIEW EXXON SITE.  RESPONDENT IS REQUIRED TO PAY AN ADMINISTRATIVE PENALTY OF $19,700.00 AND COMPLY WITH ALL APPLICABLE UST REGULATIONS.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*