← EPA enforcement cases

WAKE COUNTY BOARD OF EDUCATION (HARRIS CREEK ELEM. SCHOOL)

Administrative - Formal · FY2007 · — · Final Order With Penalty · 600046506

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2007-4517
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (2)

Summary

5/30/2007 - CONSENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $8,000. DURING THE COMPLIANCE STORM WATER EVALUATION INSPECTION ON 9/27/2006, EPA INSPECTORS OBSERVED THE FOLLOWING: A WATER PUMP WAS PLACE IN DETENTION POND B, WHICH PUMPBED UNTREATED SEDIMENT LATENT STORM WATE PAST EROSION CONTROLS AND DIRECTLY INTO THE OUTFALL AND INTO THE STREAM. THIS IS A FAILURE TO COMPLY WITH PART II.C.E. OF THE PERMIT. THERE WERE NO LEVEL SPREADERS IN PLACE AT THE OUTALLS OF SEDIMENT BASIN A OR B AS REQUIRED BY THE PLAN. THIS IS A FAILURE TO COMPLY WITH PART II.C.1 OF THE PERMIT. THE BANKS OF STORM WTE DETENTION POND B WERE UNSTABILIZED AND IN NEED OF MAINTENANCE AT THE TIME OF INSPECTION, AS REQUIRED BY PART I.C.2 OF THE PERMIT. HIGHLY TURBID STORM WATER HAD MIGRATED THROUGH THE SILT FENCE AND INTO AN UNNAMED TRIBUTARY TO THE NEUSE RIVER, WHICH IS LOCATED NEAR SEDIMENT BASIN B. THIS A VIOLATION OF PART II.B.2 OF THE PERMIT.

Source

Authoritative
EPA ECHO
Machine