6/7/2007 - ADMINISTRATIVE ORDER ISSUED. DURING THE CSWEI, EPA OBSERVED THE FOLLOWING: RESPONDENT DID NOT RETAIN A COPY OF THE SWPPP ON=SITE OR, IF NOT ON-SITE, PROVIDE THE LOCATION OF THE SWPPP, ALONG WITH A CONTACT PHONE NUMBER, IN ACCORDANCE WITH SECTION 3.3.1 OF THE PERMIT. RESPONDENT DID NOT POST NEAR THE MAIN ENTRANCE OF THE CONSTRUCTION SITE ACCESSIBLE TO THE PUBLIC: (1) THE NOC; (2) NAME, COMPANY NAME, E-MAIL ADDRESS (IF AVAILABLE), TELEPHONE NUMBER AND ADDRESS OF THE PROJECT SITE OWNER OR LOCAL CONTACT PERSON; (3) A BRIEF DESCRIPTION OF THE PROJECT; AND (4) THE LOCATION OF THE SWPPP IF IT IS NOT LOCATED ON-SITE IN ACCORDANCE WITH SECTION 3.3.2 OF THE PERMIT. RESPONDENT FAILED TO PROPERLY DESIGN AND IMPLEMENT AND FAILED TO MAINTAIN THE SILT FENCES THROUGHOUT THE DEVELOPMENT, THE CONSTRUCTION ENTRANCE (EROISION PREVENTION AND SEDIMENT CONTROLS); FAILED TO PROTECT THE CURB SIDE INLET AT THE ENTRANCE (EROSION PREVENTION AND SEDIMENT CONTROL); FAILED TO REMOVE SEDIMENT FROM THE OUTFALL DITCH AT THE FRONT OF THE DEVELOPMENT; FAILED TO REMOVE RETENTION POND (CONTROL STRUCTURE), AT THE REAR OF THE DEVELOPMENT, THT WAS A FIFTY PERCENT (50%) CAPACITY; AND FAILED TO INSTALL A RAIN GAUGE AS REQUIRED IN SECTION 3.5.3.1 OF THE PERMIT.