# PAULDING PROPERTIES, INC., P12025 LLC
> **Administrative - Formal** · FY2007 · — · Final Order No Penalty
## Case
- **Activity ID:** `600061166`
- **Case Number:** 04-2007-5752
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- P12025, LLC (settlement)
- PAULDING PROPERTIES, INC. (settlement)
## Summary

8/21/2007 - CONSENT AGREEMENT AND COMPLIANCE ORDER ISSUED.  ORDER ALLEGES;  BASED UPON A SITE INVESTIGATIN PERFORMED BY EPA ON NOVEMBER 21, 2003, AND ADDITIONAL INFORMATION GATHERED FROM OTHER SOURCES, EPA DETEREMINE THAT P12025 AND PAULDING PROPERTIES DISCHARGED DREDGED AND/OR FILL MATERIAL INTO WATERS OF THE U.S. AT MULTIPLE LOCATIONS IN THE DISCHARGE AREA.  THE DISCHARGES RESULTED FROM THE PLACEMENT OF STRUCTURE, FILLING, PIPING AND IMPOUNDMENT OF TRIBUTARIES 9STREAMS) AND WETLANDS, WHILE CONSTRUCTING INFRASTRUCTURE FOR A RESIDENTIAL DEVELOPMENT. THESE JURISDICTION WATES INCLUDE UNNAMED STREAMS AND ADJACENT WETLANDS OF COLE LAKE, AN IMPOUNDMENT OF LANE CREEK, WHICH IS A TRIBUTARY OF PUMPKINVINE CREEK IN THE ETOWAH RIVER WATERSHED.  ON 9/24/04, EPA SENT P12025 AN ADMINISTRATIVE ORDER DETAILING THE RESULTS OF THE INSPECTION AND REQUESTING THAT SPECIFIC ACTIONS BE TAKEN AT THE SITE. P12025 COMPLIED WITH THE ORDER. EPA ALSO DOCUMENTED SUBSTANTIAL SECONDARY IMPACTS (SEDIMENTATION) TO OTHER ONSITE AND DOWNSTREAM WATERS BECAUSE OF THE FAILURE TO IMPLEMENT NO CWA SECTION 404 PERMIT HAS BEEN ISSUED BY THE U.S. ARMY CORPS OF ENGINEERS THAT AUTHORIZED THE RESPONDENTS TO CONDUCT THE ABOVE ACTIVITIES IN WATERS OF THE U.S.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*