The facility has an on-site septic tank/ leachpool system which has received embalming fluids. The facility failed to submit a Permit Application or Closure Plan to EPA. As a result of the non penalty Adminstrative Order, the facility has agreed to closing the injection well and in the future, use the septic system for sanitary waste only.