11/16/07 - ADMINISTRATIVE ORDER ISSUED. BASED ON INFO AVAILABLE TO EPA, THE SYSTEM FAILED TO SUBMIT A STANDARD MONITORING PLAN, A SYSTEM SPECIFIC STUDY PLAN, OR A 40/30 CERTIFICATION TO THE EPA BY OCT 1, 2007. THEREFORE THE SYSTEM IS IN VIOLATION OF 40 CFR 141.600(c)(1).
ORDER REQUIRES: WITHIN 30 DAYS OF RECEIPT OF THIS ORDER, THE SYSTEM SHALL PREPARE A STANDARD MONITORING PLAN IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.601(a); OR A SYSTEM SPECIFIC STUDY PLAN IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.602(a); OR A 40/30 CERTIFICATION IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.603(b). WITHIN 30 DAYS, THE SYSTEM SHALL SUBMIT THE STANDARD MONITORING PLAN OR THE SYSTEM SPECIFIC STUDY PLAN OR THE 40/30 CERTIFICATION TO EPA.