# Samruve Operating Corp.
> **Administrative - Formal** · FY2008 · — · Final Order With Penalty
## Case
- **Activity ID:** `600074091`
- **Case Number:** 02-2008-7906
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Samruve Operating Corp (SB) (complaint) (settlement)
## Summary

This facility was inspected in response to a citizen complaint.  The facility was issued Field Citation II-UST-FC-1239, in the amount of $750, for the following violations:  280.31(b):  failure to ensure proper operation of cathodic protection system; 280.41(a):  failure to monitor tanks and piping at least every 30 days; 280.44(a):  failure to provide ALLD for undergound piping; and 280.44(a):  failure to conduct annual test of the ALLDs.

---