11/26/07 - EXPEDITED SPCC SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $2,250. VIOLATIONS: NO SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN; FACILITY NO FULLY FENCED AND ENTRANCE GATES ARE NOT LOCKED AND/OR GUARDED WHEN PLANT IS UNATTENDED OR NOT IN PRODUCTION; RACK DRAINAGE DOES NOT FLOW TO CATCHMENT BASIN, TREATMENT SYSTEM, NOR QUICK DRAINAGE SYSTEM; STORMWATER FROM DIKED AREAS DOES NOT FLOW INTO PONDS, LAGOONS, CATCHMENT BASINS, NOR DIVERSION SYSTEM DESIGNED TO RETAIN OR RETURN OIL TO THE FACILITY; AREAS OUTSIDE OF CONTAINER NOT FREQUENTLY INSPECTED FOR SIGNS OF DETERIORATION, DISCHARGES, OR ACCUMULATION OF OIL INSIDE DIKED AREA; RECORDS OF INSPECTIONS OF ABOVEGROUND TANKS ARE NOT MAINTAINED; ABOVE-GROUND VALVES AND PIPELINES ARE NOT INSPECTED REGULARLY.