← EPA enforcement cases

SADDLEBROOK DEVELOPMENT, LLC (RUSHLAND PARK SUBDIVISION)

Administrative - Formal · FY2008 · — · Final Order With Penalty · 600084654

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2008-4507
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

3/3/08 - CONSENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $28,551, DUE WITHIN 30 DAYS. EPA ALLEGES THAT RESPONDENT FAILED TO COMPLY WITH: SECTION 3.5.3.1 OF THE PERMIT BY FAILING TO PROPERLY DESIGN AND IMPLEMENT AND FAILING TO MAINTAIN SILT FENCES AND A RETENTION POND, FAILED TO PROTECT INLETS, AND FAILED TO REMOVE SEDIMENT FROM TWO OUTFALL DITCHES; SECTION 3.5.3.1 AND 3.5.3.2 OF THE PERMIT BY FAILING TO IMPLEMENT STABILIZATION MEASURES IN AREAS OF THE SITE WHERE CONSTRUCTION HAD NOT OCCURRED WITHIN 15 DAYS OF THE END OF CONSTRUCTION ACTIVITY; SECTION 3.5.3.3 OF PERMIT BY FAILING TO HAVE A CLEAN-OUT MARKER, FAILING TO MAINTAIN THE SEDIMENTATION BASIN, AND FAILING TO MAINTAIN THE SEDIMENT BASIN SO THAT IT RETAINED SEDIMENT DURING LOW FLOWS; SECTION 3.5.7 OF THE PERMIT BY FAILING TO MAINTAIN THE SILT FENCES, RETENTION POND, AND STORM WATER INLETS; SECTION 6.4 AND 6.14 OF THE PERMIT BY FAILING TO TAKE ALL REASONABLE STEPS TO MINIMIZE OR PREVENT ANY DISCHARGES THAT HAVE A REASONABLE LIKELIHOOD OF ADVERSELY AFFECTING THE ENVIRONMENT BY FAILING TO OPERATE AND MAINTAIN ALL FACILITIES AND SYSTEMS OF TREATMENT AND CONTROL, INCLUDING SILT FENCES, STABILIZATION, AND THE SEDIMENTATION POND TO REDUCE POLLUTANTS IN STORM WATER DISCHARGES.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown