The facility was inspected by EPA Contractors on February 20, 2007. The Inspection Checklist was reviewed by R Jamison, EPA. The contractor noted that there was a failure to conduct annual tightness tests on pressurized piping. R Jamison concurred and issued a Field Citation from the desk