# NOVEL IRON WORKS INC
> **Administrative - Formal** · FY1997 · — · —
## Case
- **Activity ID:** `803`
- **Case Number:** 01-1997-0251
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- NOVEL IRON WORKS INC (complaint) (settlement)
## Summary

DURING EPA INSPECTION ON 1/27/97 FOR SPCC AND STORMWATER,  NOVEL HAD NO SPCC PLAN AND THE STORMWATER PLAN WAS NOT       SIGNED AND CERTIFIED. THE ORDER REQUIRES A REVISION OF THE   THE SWPP AND IMPLEMENTATION OF AN INFORMATION REQUEST FOR    DOCUMENTATION THAT THE SPCC PLAN IS REVISED AND IMPLEMENTED.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*