# KING'S GRANT CLEANERS
> **Administrative - Formal** · FY2001 · — · —
## Case
- **Activity ID:** `8297`
- **Case Number:** 02-2001-1262
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- KING'S GRANT CLEANERS (complaint)
## Summary

COMPANY FAILED TO INSPECT THE COMPONENTS OF THE DRY CLEANING SYSTEM ON AT LEAST ON A BIWEEKLY BASIS FOR PERCEPTIBLE LEAKS WHILE THE DRY CLEANING SYSTEM IS OPERATING; FAILED TO MEASURE THE TEMPERATURE OF THE AIR-PER GAS-VAPOR STREAM ON THE  OUTLET SIDE OF THE REFRIGERATED CONDENSOR ON A DRY-TO-DRY MACHINE WITH A TEMPERATURE SENSOR ON A WEEKLY BASIS; FAILED TO CALCULATE THE DIFFERENCE BETWEEN THE TEMPERATURE OF THE AIR-PER GAS-VAPOR ENTERING AND EXITING THE REFRIGERATED CONDENSOR ON A WASHER WEEKLY TO DETERMINE THAT THE DIFFERENCE IS >OR= TO 20F; FAILED TO KEEP RECEIPTS OF PERC PURCHASES ON SITE AND SHOWING THEM UPON REQUEST; FAILED TO KEEP: 1) A LOG OF THE VOLUME OF PERC THAT IS PURCHASED EACH MONTH 2) A LOG OF THE YEARLY CONSUMPTION OF PERC BY THE FACILITY AND 3) A LOG OF OF THE DATES WHEN DRY CLEANING SYSTEM COMPONENTS ARE  INSPECTED FOR PERCEPTIBLE LEAKS AND THE NAME AND LOCATION OF DRY CLEANING SYSTEM COMPONENTS WHERE PERCEPTIBLE LEAKS ARE DETECTED; AND FAILED TO KEEP NECESSARY RECORDS REGARDING TEMPERATURE SENSOR MONITORING RESULTS RELEVANT TO THE PROPER OPERATION OF THE REFRIGERATED CONDENSOR AND THE DATE(S) ON WHICH THE TEMPERATURE MONITORING WAS PERFORMED.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*