***** THE COROZAL WASTEWATER TREATMENT PLANT HAS NOT BEEN PROPERLY OPERATED AND MAINTAINED. DURING AN INSPECTION CONDUCTED BY EPA SEVERAL OPERATIONAL DEFICIENCIES WERE OBSERVED. THE ORDER REQUIRES PRASA TO IMMEDIATELY MAXIMIZE THE OPERATION OF THE FACILITY TO MEET EFFLUENT LIMITATIONS AND TO CORRECT THE DEFICIENCIES AT THE FACILITY.