THE SABANA GRANDE WASTEWATER TREATMENT PLANT WAS FOUND TO HAVE SEVERAL OPERATION DEFICIENCIES DURING AN INSPECTION CONDUCTED BY EPA ON MAY 16, 2001. THE ORDER REQUIRES PRASA TO IMMEDIATELY MAXIMIZE THE OPERATION OF THE FACILITY TO MEET EFFLUENT LIMITATIONS AMD TO CORRECT THE DEFICIENCIES AT THE FACILITY.