# Central Oil & Supply Corp.
> **Administrative - Formal** · FY2002 · — · Final Order With Penalty
## Case
- **Activity ID:** `84094`
- **Case Number:** 06-2002-0002
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Central Oil & Supply Corp. (complaint) (settlement)
## Summary

'''''''VIOLATIONS: 1) Failure to provide functional automatic line leak detector (alld); 2) Failure to conduct adequate release detection for pressurized piping; 3) Failure to provide adequate release detection for tanks; 4) Failure to provide adequate corrosion protection for metal components of  existing  underground piping; 5a) Failure to provide adequate corrosion protection for metal components of  new  underground piping; 5b) Failure to provide adequate corrosion protection for metal components of  new  underground piping; 6) Failure to monitor corrosion protection system within 6 months of installation then every three years thereafter; 7) Failure to provide adequate overfill prevention for  existing  ust system: and 8) Failure to meet  new  performance standards (overfill and spill prevention).                                                               PROPOSED PENALTY: $150,000.00                                                                                    INJUNCTIVE RELIEF: Compliance order to correct the violations.'

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*