THE FACILITY VIOLATED EFFLUENT LIMITATIONS FOR TDS, BOD, CADMIUM, AND TEMPERATURE. THE FACILITY WAS ISSUED AN ORDER AND IS WORKING TO RECYCLE ITS EFFLUENT AND CEASE DISCHARGES. IN ADDITION, THE PERMIT ALLOWS FOR THE FACILTIY TO CONDUCT A STREAM STUDY AND THEN UTILIZE THE RESULTS OF THE STREAM STUDY TO DETERMINE IF THE CADMIUM AND TDS LIMITS COULD BE INCREASED. THE FACILITY VIOLATED EFFLUENT LIMITATIONS FOR TDS, BOD CADMIUM AND TEMPERATURE. THE FACILITY WAS ISSUED AN ORDER AND IS REQUIRED TO COMPLY WITH ITS EFFLUENT LIMITATIONS AND STORMWATER LIMITATIONS. IN ADDITION THE PERMIT ALLOWS FOR THE FACILITY TO CONDUCT A STREAM STUDY AND THEM UTILIZE THE RESULTS OF THE STREAM STUDY TO DETERMINE IF THE CADMIUM AND TDS LIMITS COULD BE INCREASE.