# Grand Resources, Inc. - Blazer Lease Facility
> **Administrative - Formal** · FY2002 · — · Withdrawn by Region/State
## Case
- **Activity ID:** `85070`
- **Case Number:** 06-2002-4371
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Withdrawn by Region/State
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Grand Resources, Inc. (complaint) (settlement)
## Summary

**VIOLATIONS: 1) Plan not certified by a professional engineer; 2) No management approval of plan; 3) Written procedures and a record of inspections are not made part of the plan; 4) Visual tank inspections are not conducted periodically by appropriate personnel and/or inspections do not include tank foundation and supports; and 5) Above ground valves and pipelines are not examined periodically on a scheduled basis for general condition.                                                                                                                  **ASSESSED PENALTY: $1,250.00.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*