'EPA PERFORMED A TIME CRITICAL REMOVAL ACTION IN 1998 AND 1999. THE SITE CONSISTED OF DILAPIDATED MILL WITH HAZARDOUS SUBSTANCES INSIDE AND OUTSIDE THE STRUCTURE. HAZARDOUS SUBSTANCES HAD BEEN RELEASED AND WERE CONTINUING TO BE RELEASED INTO THE SACO RIVER, A DRINKING WATER SUPPLY.'