'**VIOLATIONS: 1) Plan not certified by a professional engineer; 2) Written procedures and a record of inspections are not made part of the plan; 3) Spill prevention briefings are not scheduled and conducted periodically; 4) Adequate records of drainage events are not maintained; 5) Records of inspections of aboveground tanks are not maintained; 6) Secondary containment inadequate for mobile or portable storage tanks; and 7) Facility not fully fenced and entrance gates are not locked and/or guarded when plant is unattended or not in production. **ASSESSED PENALTY: $1,100.00.